Commercial Contracts

The New Members Club Under Construction

Quay Club, Heron Quay, London


Main Contractor: Canary Wharf Contractors
Engineer: ARUP
Architect: Adamson Associates Architects
Constructed: 2018
Elland Value: £4.2 million
Project Tonnage: 1600 tonnes


A new five-storey steel framed structure to accommodate exclusive guest rooms restaurants and leisure space. Elland Steel fabricated, supplied and installed 400t of weathering steel for the lower deck level which is sat on a series of existing piles over a portion of Middle Dock in Londonís Canary Wharf, as well as an additional 1,200t of steelwork for the main structure.

This unique contract posed a number of challenges, such as the need to use a temporary bracing strategy to limit the amount of loading applied to the piles, and the use of floating pontoons to enable access for workers and machinery during erection.

The Steel Frame Under Construction

King's Cross Bridge, London


Main Contractor: J Murphy & Sons Ltd.
Engineer: Ramboll
Architect: Latitude Architects
Constructed: 2018
Elland Value: £0.7 million
Project Tonnage: 230 tonnes


Elland Steel provided the metal decking and stairs along with fabricating, supplying and erecting the steel frame for this 18,000 sq ft office and retail building. Built on a basement slab which is the tunnel soffit of both the Metropolitan London Underground Line and the Moorgate National Rail Line close to Kingís Cross Station.

The confined nature of this central London site along with its location over active rail lines required careful planning to ensure that steelwork was delivered to site and erected on anti-vibration bearings whilst keeping disruption to a minimum.

Steelwork Being Erected In Sight Of The London Aquatics Centre

The International Quarter, London


Main Contractor: Lend Lease Ltd
Engineer: ARUP
Architect: Rogers Stirk Harbour & Partners
Constructed: 2016/17
Elland Value: £3.75 million
Project Tonnage: 1000 tonnes


This 650,000 ft2 grade A office has been prelet to the FCA (Financial Conduct Authority). This is the 2nd office of the 12 to be constructed over a 10 year period adjacent to the 2012 Olympic Park.

Aerial view of construction just prior to completion

Greengates, The Embankment Manchester


Main Contractor: Carillion Building plc.
Engineer: Ramboll UK
Architect: Flanagan Lawerence
Constructed: 2016
Elland Value: £5.95 million
Project Tonnage: 3,750 tonnes


Built within the confines of the old Exchange station in Manchester, Greengates Embankment is a 3 storey (20,000m2) car park with a 19,000m2 10 storey grade A office above fully let to Swinton Insurance Group.

Architects Impression Of The Finished Building At Night

Central Square Leeds


Main Contractor: Wates Construction Ltd
Engineer: WSP
Architect: DLA Architecture
Constructed: 2015/16
Elland Value: £4.25 million
Tonnage: 2,000 tonnes


The central square development situated in a prime location close to Leeds railway station consists of a 12 storey mixed used structure providing office, retail and leisure space, with the structure being designed to ensure flexibility, with large floorplates that can be easily sub dived.

Architects Impression Of The Finished Building

No. 1 St Peters Square, Manchester


Main Contractor: Carillion Building plc
Engineer: Tier Consult
Architect: Weedon Partnership
Constructed: 2013/14
Elland Value: £1.2 million
Project Tonnage: 250 tonnes


No. 1 St Peters Square is a Grade A office development set in the heart of Manchester city centre, prelet to KPMG. Elland Steel designed and constructed the steel, metal decking & Fire Protection to the top three floors plus the plant room.

The completed building in St Helier

Royal Bank Of Canada, Jersey


Main Contractor: Dandara (Jersey) Ltd
Engineer: Walsh Goodfellow
Architect: Axis Mason
Constructed: 2015/16
Elland Value: £4.35 Million
Project Tonnage: 2000 tonnes


66-72 Esplanade is a grade A, 6 storey office development in St Helier Jersey for the Royal Bank Of Canada.

The Building Close To Completion

Jersey International Finance Centre Building 4


Main Contractor: Cameron's
Engineer: Waterman Partnership
Architect: MJP Architects
Constructed: 2016/17
Elland Value: £2 million
Project Tonnage: 600 tonnes


Building No 4 is the first of six blocks to be constructed at the International Finance Centre Site in Jersey.
Since constructing block 4, Elland have recently secured Block 5, with a site delivery date of August 2017.

Aerial view of constuction in progress

First Street, Manchester


Main Contractor: Carillion Building Plc.
Engineer: Ramboll UK
Architect: Fletcher Priest
Constructed: 2016/17
Elland Value: £3.65 million
Tonnage: 1,800 tonnes


No. 8 First Street is a 180,000 ft2 over eight floors for developer Ask plc.

Artists Impression Of The Finished Building

Plot 3175 Thorpe Park Leeds


Main Contractor: GMI Construction Group Plc.
Engineer: Buro Happold
Architect: CJCT Studios
Constructed: 2016
Elland Value: £0.6 million
Tonnage: 360 tonnes


3 storey office comprising cellular beams & 6No 15t plate girders to produce a column free environment for the client.

 